Trained per project
We train the AI on your project, not on generic construction.
Before the first site walk, you hand over the project data. We train your assistant on it, so every protocol is read in the context of what was priced, drawn and scheduled.
A
What you give us
Bill of quantities
Every priced position and quantity
Drawings
Plans, sections, revisions
Timelines
Programme, milestones, lead times
Specifications
Materials, tolerances, standards
Contract & change orders
Scope, variations, agreed rates
Key project information
Parties, roles, responsibilities
B
What we do with it
C
What comes back
Quantity deviations
Installed vs. priced, flagged with the position
Schedule risks
Milestones affected by what was agreed
Commercial impact
Cost consequence, with a Nachtrag draft
Open responsibilities
Who owes what, by when
One logic across the project
From one conversation to a project-wide check.
The logic does not sit on a single report. It applies across the project, so a decision taken in the basement is checked against the schedule, the BOQ and the change orders that follow from it.
01
You hand over the project data
BOQ, drawings, timelines, specifications, contract and change orders.
02
We train your assistant on it
Your project becomes the reference the AI reads every protocol against.
03
A conversation happens on site
The assistant listens, understands and writes the report as usual.
04
The report is checked and flagged
Deviations, risks and cost consequences surface the same day, across the whole project.